I enclose the lavish new video of the new stadium development at Campy Nou which is available to view on the club website.
https://dundeefc.co.uk/news/camperdown-flythrough/
This video has been generated from a Computer Aided Design (CAD) the same way as a kitchen designer starts off with an empty room and installs the requirements of their customer for their new kitchen using a Computer Aided Design.
It is stated in the enclosed Q and A that the total cost of the project is £95 million paid for with a 100 year mortgage. The buildings and the new stadium are unlikely to still be standing in their current form in fifty years time let alone 100 years time without major repairs and/or rebuilding. This will cost a lot more money which will have to be repaid.
The article also speaks about Dundee Football Club being in operation in 150 years time.
If Dundee FC keeps losing £2.8 million every year and Tim Keyes stops bank rolling them then they might not be still in business in five years as I do not think that the supporters have the stomach to attempt to fund raise for Admin 3.