[QUOTE=Mainlanddee;40740608]
Quote Originally Posted by Deeranged View Post
Is there enough rise and drop between the road and the proposed car park to allow for a graded slip or would it mean additional cost to bank up from the road and back to car park level? Is it a preference of TS or required by regulation?


I can 100% see why the developers would oppose the graded slip if it meant extra cost and if it's not absolutely necessary.[/QUOTE

Thats fair enough, but its wrong for nelms to sayTS have not provided any solutions, unfortunately at the end of the day , nelms needs TS approval to build a slip road off a TS road
But a preference isn't a solution. It's certainly a proposal but it solves nothing so why delay?