The SNP undoubtedly has to answer for the ferries mess.
However, how much (if anything) of this have you read about in the mainstream press:
https://www.thenational.scot/news/23...nical-failure/
A £3 BILLION warship which was only declared fully operational in 2021 is to be partially stripped for parts following a major mechanical failure.
...The HMS Prince of Wales, which was built at Rosyth Dockyard between 2011 and 2019, was expected to be ready for frontline duties in the Royal Navy by 2023.
Repairs to the HMS Prince of Wales are set to cost around £25 million although the navy insists that it will still be operational within the agreed timeframe.
No. Me neither. Funny that, eh?



Reply With Quote
