Quote Originally Posted by Mainlanddee View Post
TS say a graded slip road would be the ideal solution, Nelms does not agree , and has rejected this solution , probably due to cost
Is there enough rise and drop between the road and the proposed car park to allow for a graded slip or would it mean additional cost to bank up from the road and back to car park level? Is it a preference of TS or required by regulation?

I can 100% see why the developers would oppose the graded slip if it meant extra cost and if it's not absolutely necessary.