    Quote Originally Posted by Deeranged View Post
    And yet anyone with even a modicum of common sense can see that right on a major trunk road where traffic can access and egress quickly and efficiently without having to encounter traffic lights, roundabouts, housing schemes, pedestrians etc. on their way to the nearest major trunk road is exactly the right place for such a thing.

    I'm sure Police Scotland will have been fully consulted on the latest traffic management plan and doubt it would have been submitted should they have proclaimed major misgivings.
    Bob Hynd told us back in 2018 that the Scottish Government rules for vehicles exiting from a car park onto the slip road to a flyover have been changed and vehicles were now no longer permitted to exit a car park directly onto a slip road to a flyover.
    Bob said that the exit road for vehicles leaving the Kingsway West retail park onto the slip road to the Crematorium roundabout would have been banned.

  2. #2
    Join Date
    Jul 2007
    Posts
    9,506
    Quote Originally Posted by islaydarkblue View Post
    Bob Hynd told us back in 2018 that the Scottish Government rules for vehicles exiting from a car park onto the slip road to a flyover have been changed and vehicles were now no longer permitted to exit a car park directly onto a slip road to a flyover.
    Bob said that the exit road for vehicles leaving the Kingsway West retail park onto the slip road to the Crematorium roundabout would have been banned.
    I'm fully aware of the revised slip road access regulation which is probably a well enough intentioned one. Seems overkill to me but what do I know? However, what I can't see is where the plans submitted for entry / egress to / from the site is on a slip road so your point is moot.

    If the regulation had been revised prior to approval for the construction of Kingsway / McAlpine Road, Clepington Road and Kings Cross Road flyover then no doubt it wouldn't have been allowed (banned is the wrong word please do better research) and a re-design required.

  3. #3
    Join Date
    Jan 2014
    Posts
    7,456
    [QUOTE=Deeranged;40689824]I'm fully aware of the revised slip road access regulation which is probably a well enough intentioned one. Seems overkill to me but what do I know? However, what I can't see is where the plans submitted for entry / egress to / from the site is on a slip road so your point is moot.

    If the regulation had been revised prior to approval for the construction of Kingsway / McAlpine Road, Clepington Road and Kings Cross Road flyover then no doubt it wouldn't have been allowed (banned is the wrong word please do better research) and a re-design required.[/QUOTE
    The original plan in September 2017 was to use the previous entrance and exit road from the NCR Camperdown factory as the entrance and exit road from the new stadium car parks.
    If you look at the plans for the new stadium development at Campy Nou published in December 2023 by Nelms’s latest firm of architects which showed a Computer Aided Design you will see they have shown both the entrance road from the A90 Kingsway to the new stadium car parks and a separate exit road from the new stadium car parks back onto the A90 Kingsway in breach of the laid down Scottish Government and Transport Scotland rules.

  4. #4
    Join Date
    Jul 2007
    Posts
    9,506
    [QUOTE=islaydarkblue;40689992]
    Quote Originally Posted by Deeranged View Post
    I'm fully aware of the revised slip road access regulation which is probably a well enough intentioned one. Seems overkill to me but what do I know? However, what I can't see is where the plans submitted for entry / egress to / from the site is on a slip road so your point is moot.

    If the regulation had been revised prior to approval for the construction of Kingsway / McAlpine Road, Clepington Road and Kings Cross Road flyover then no doubt it wouldn't have been allowed (banned is the wrong word please do better research) and a re-design required.[/QUOTE
    The original plan in September 2017 was to use the previous entrance and exit road from the NCR Camperdown factory as the entrance and exit road from the new stadium car parks.
    If you look at the plans for the new stadium development at Campy Nou published in December 2023 by Nelms’s latest firm of architects which showed a Computer Aided Design you will see they have shown both the entrance road from the A90 Kingsway to the new stadium car parks and a separate exit road from the new stadium car parks back onto the A90 Kingsway in breach of the laid down Scottish Government and Transport Scotland rules.
    I looked at the plan issued most recently and it shows nothing of the sort.

  5. #5
    Join Date
    Jan 2014
    Posts
    7,456
    [QUOTE=Deeranged;40690045]
    Quote Originally Posted by islaydarkblue View Post

    I looked at the plan issued most recently and it shows nothing of the sort.
    I saw the plans in Bob Hynd’s office in 2018 and it showed that Dark Blue Property Holdings Limited were planning to use the same original access and exit road for the NCR Camperdown factory for the new stadium development car parks at Campy Nou.
    There was nothing in the original 2017 plans about using the back door access road for the NCR Camperdown factory to access the new stadium development car parks.

  6. #6
    Join Date
    Jul 2007
    Posts
    9,506
    [QUOTE=islaydarkblue;40690829]
    Quote Originally Posted by Deeranged View Post
    I saw the plans in Bob Hynd’s office in 2018 and it showed that Dark Blue Property Holdings Limited were planning to use the same original access and exit road for the NCR Camperdown factory for the new stadium development car parks at Campy Nou.
    There was nothing in the original 2017 plans about using the back door access road for the NCR Camperdown factory to access the new stadium development car parks.
    And it was changed to comply. There are no longer plans to access the site from an existing slip road.

    What the actual f--k is wrong with you?

  7. #7
    Join Date
    Jan 2014
    Posts
    7,456
    [QUOTE=Deeranged;40690918]
    Quote Originally Posted by islaydarkblue View Post

    And it was changed to comply. There are no longer plans to access the site from an existing slip road.

    What the actual f--k is wrong with you?
    I was speaking about the original plans in September 2017 which were changed because Transport Scotland told Nelms in 2018 that they would only look at allowing vehicles to exit from the new stadium car parks onto the A90 slip road for the Camperdown flyover if they could show detailed plans for five separate exit roads from the new stadium car parks which were unworkable.

Forum Info

Footymad Forums offer you the chance to interact and discuss all things football with fellow fans from around the world, and share your views on footballing issues from the latest, breaking transfer rumours to the state of the game at international level and everything in between.

Whether your team is battling it out for the Premier League title or struggling for League survival, there's a forum for you!

Gooners, Mackems, Tractor Boys - you're all welcome, please just remember to respect the opinions of others.

Click here for a full list of the hundreds of forums available to you

The forums are free to join, although you must play fair and abide by the rules explained here, otherwise your ability to post may be temporarily or permanently revoked.

So what are you waiting for? Register now and join the debate!

(these forums are not actively moderated, so if you wish to report any comment made by another member please report it.)



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •